In Cherkasy will be closed for repairs the only bridge across the Dnieper

В Черкассах закроют на ремонт единственный мост через Днепр

The length of the bridge in Cherkasy about one kilometer, and dam – 12 miles

Allow only buses and special vehicles.

In Cherkassy on June 19 will begin repair work on the dam and the only bridge across the Dnieper river that connects the left and right Bank of the river in this area of the Kremenchug reservoir. This was reported on the website of the Cherkasy regional administration.

Authorities previously calculated that the repair work will last about four months. Restriction of movement is effective for most types of vehicles. An exception will be made only buses and special vehicles: they will be admitted according to admissions from 6:00 to 9:00 and 16:00 to 19:00. Now the bridge runs 28 buses.

Also remain valid schedules for the operation of diesel trains:

– from the station of the Cherkasy at 7:30, 17:10 and 22:15;

– from the station Zolotonosha at 1:31, 13:26 and 20:01.

For the duration of the bridge repair will be provided for the movement of additional diesel trains:

– from the station of the Cherkasy at 12:02 and 14:41;

– from the station Zolotonosha 13:11 and 15:52.

In the regional state administration noted that drivers of cars and trucks in the area there are information boards, warning signs and panels, where the proposed scheme of detour.

Note that the total length of the dam to the bridge is 13 kilometers. It is the largest such facility in Ukraine.

As reported Корреспондент.netin may, Ukraine and China agreed on the construction of the bridge at Kremenchug and reconstruction Shulyavska overpass in Kiev. The total costs worked into the $ 400 million.

Source

Leave a Reply

Your email address will not be published. Required fields are marked *