Airport Zhulyany twice extends the terminal

Аэропорт в Жулянах вдвое расширит терминал

Works on reconstruction of terminal A of airport Kyiv is scheduled for completion in may 2019

The area of the terminal And the airport “Kyiv” them. Igor Sikorsky will increase by 9.5 thousand square meters. m is planned to be completed in may 2019.

At the international airport Kyiv to them. Igor Sikorsky’s plan to significantly expand the terminal and double its capacity. On Friday, October 12, the press service of the airport in Facebook.

Noted that the project is estimated at 630 million UAH, and the work will be completed in may 2019. As a result, the area of the terminal And will increase by 9.5 thousand square meters.

“On the first floor of the new wing of the terminal will have 18 check-in counters and nine points of oversight of aviation security. On the second, 18 stands of border control. Passengers will pass through it faster and get into the waiting area with three restaurants, two bars, two duty free shops”, – stated in the message.

The plans of the airport owners also construction on the territory of the Kiev airport for aircraft hangars and three-star hotel, said the press service.

Informed the capital airport Kiev (Zhulyany) was named after the aircraft designer Igor Sikorsky.

Before the international airport Kiev (Zhulyany) has launched an electronic system to read boarding passes at the control points of aviation security in terminal B.

News from the Reporter.net Telegram. Subscribe to our channel https://t.me/korrespondentnet

Source