Russia called the timing of the launch of a new leg of the power bridge to Crimea

РФ назвала сроки запуска новой нитки энергомоста в Крым

Plans can change due to weather conditions.

Russian authorities have announced their intention to run the fourth line of the power bridge to the Crimea until may 10, reports TASS.

“In the first decade (may) will try to start under favorable weather conditions. That’s (run), I think that until 10 may to decide. But it all depends on the weather,” said Russian Deputy Prime Minister Dmitry Kozak.

Recall that the third branch of the power bridge to Crimea Russia launched 14 APR.

On 12 April, the builders erected the first pillar of the bridge across the Kerch Strait under a car track on the island of Tuzla.

And on April 13 it became known that the construction of the railway across the Kerch Strait to Crimea will be completed later than scheduled.

Later, the Russian authorities said that the Kerch bridge between Crimea and Krasnodar Krai, will open on 18 December 2018.

The astronaut showed the Kerch bridge from space

Source